Technology & products
Technology & products
Home > Technology & products > Technological
Constructed wetland worked in low temperature

In order to apply the constructed wetland in cold climate, lots of technique such as intensive pretreatment, change the construction, change the feeding mode, rhizosphere oxygen supply etc.


The cost of the wastewater treatment in this device is 0.1~0.2 yuan/t water (including energy cost, manpower cost, depreciation cost)